Energy Industries/Cases

POWELL Industries – UK

Project Name:Power Substation Automation
End user:BP
Consultant:Powell Industries
Contractor:Powel Industries
Period: 2014-2015
Description:Power substation Automation. The project is based on Redundant  RTU32 with 61850 Client & Server + modbus client & Server + Brodersen native Binding protocol.

YEDAS – Turkey

Project Name:Power Substation Automation
End user:Yedas
Consultant:GE (General Electric)
Contractor:GE (General Electric)
Period: 2013-2014
Description:Power substation Automation. +100 RTU’s where used for control and monitoring the substations. Up to 26 IED where connected to each Brodersen RTU32. The IED’s where on 61850. 61850 was converted to 60870-5-104 in the RTU’s before sent to YEDAS SCADA. Larger sites was above 35K variables. SNMP where used for synchronizing the substations to central SCADA.

Sanofi-Aventis – France

Project Name:Power Station Automation
End user:Sanofi-Aventis
Consultant:N/A
Contractor:N/A
Period: 
Description:Plant Power Automation. 34 power stations controlled and monitored by Brodersen RTU32. Task includes uptime critical requirements and sites with redundant setup.

Alstom – Norway

Project Name:Hydro Power Plant Management
End user:Statkraft, Norway
Consultant:N/A
Contractor:Alstom
Period:2008
Description:Monitoring and control of Hydro Power plant distributed in Norway. Complete plant control and regulation. Meets the high level IEC60870-5-104 Statkraft requirements with Redundancy Groups etc. RTU32 obtained KEMA approval for this application.

Areva – Germany

Project Name:10kV Switch
End user: 
Consultant:N/A
Contractor:N/A
Period:2003
Description:Monitoring and control of medium high voltage switches 10KV. Special RTU and extension modules for operation in high magnetic field environment. IEC60870-5-101 protocol via GSM.

Cegelec – Philippines

Project Name:Monitoring Power Stations
End user:N/A
Consultant:N/A
Contractor:Cegelec
Period:2003
Description:Monitoring transformer stations. IEC60870-5-101 communication using leased lines.

N-ERGIE – Germany

Project Name:Remote Metering, Transformer Monitoring & Control
End user:N-ergie
Consultant:N/A
Contractor:ABB
Period:2001 to 2003
Description:Monitoring and metering in an electricity network with more than 1,700 outstations. IEC60870-5-101 communication via leased lines. The RTUs feature a built-in interface for IEC 1107 and IEC 102 meter interface.

RWE – Germany/Austria

Project Name:Remote Metering, Transformer Metering & Control
End user:RWE
Consultant:N/A
Contractor:N/A
Period:2002
Description:Monitoring and metering of small and medium hydro-power stations in Austria via RWE-European Backbone from central host in Germany.

Stadtwerke Hagen – Germany

Project Name:Metering, GSM
End user:Stadtwerke Hagen
Consultant:N/A
Contractor:N/A
Period:2001 to 2002
Description:Electricity consumption metering for high volume customers. Transparent meter interface for uploading load-profile transmission and remote meter setup. More than 400 intelligent GSM modems installed.

NPower – UK

Project Name:Precipitator Monitoring
End user:NPower
Consultant:PIACS
Contractor:N/A
Period:2000 to date
Description:Supply of several Bitbus gateway and optical repeater modules to monitor a number of precipitators made by PIACS in a power station situated in South East of England.

EFT – Ireland

Project Name:Energy Management
End user:Electricity Supply Board customers
Consultant:EFT – Ireland
Contractor:N/A
Period:2002 to date
Description:EFT uses Brodersen’s RTUs in conjunction with their Energy Management software to monitor energy usage. EFT jointly markets their solution with the Electricity Supply Board (ESB) of Ireland. The aim is to identify where and how electricity is being used by ESB’s customers by sub-metering of appliances etc.